Thanks guys. Your supportive comments have put a pretty big smile on my face tonight. Especially 635's update. Lots to be optimistic about.
I spent the better part of the day working on the Air Dog II. Was planning on installing it if all went well...it did and it didn't. Good thing I didn't perform any tear down on the Walbro set up cause I didn't even get to turn a wrench on the truck.
But, I have some detailed drawings to scale from all the measurements taken.
The mounting brackets are cut to fit, I know where to drill the frame.
I fabbed up a spacer that will not work the way I want/need it too and that's a good thing to recognize before failure down the line.
Then I decided to re-orient the pump to minimize all the fuel 'U-Turns' in the fuel flow the way it was initially set up.
Now I have to wait a week or so...another business trip this week starting tomorrow and ending Friday.
Now I'm the one that is running low time. Still have to finish the FS2500 set ups and get the intake stuff to be anodized.
I spent the better part of the day working on the Air Dog II. Was planning on installing it if all went well...it did and it didn't. Good thing I didn't perform any tear down on the Walbro set up cause I didn't even get to turn a wrench on the truck.
But, I have some detailed drawings to scale from all the measurements taken.
The mounting brackets are cut to fit, I know where to drill the frame.
I fabbed up a spacer that will not work the way I want/need it too and that's a good thing to recognize before failure down the line.
Then I decided to re-orient the pump to minimize all the fuel 'U-Turns' in the fuel flow the way it was initially set up.
Now I have to wait a week or so...another business trip this week starting tomorrow and ending Friday.
Now I'm the one that is running low time. Still have to finish the FS2500 set ups and get the intake stuff to be anodized.