Starting building new battery cables. Got the engine to frame ones done, need to get the box mounted in the bed to do the frame to battery grounds and the positive cables. Started working on intercooler piping. The driver side is basically done, waiting on a few pieces to do the passenger side. Test fitted the passenger inner fender and it will need to be trimmed for intercooler pipe clearance, probably the same with the driver side.