racedaymechanic
Active Member
Took me a few hours today but i Got it all up and Working, No real issues, First I cut, bent and flared the existing steel fuel line used a -6 nut and bushing, You have to be sure and flare 37 degrees fo an/jic fittings, I did manage to chug 6 or so Bud Lites while I was at it
Then put the Mock up panel up with the mounts I built held it in place with a small magnet while I welded it in place
Here is the Panel bolted up and connected to the lines, I used -6 Braided lines I made at work to go to the FF
Here is the FF with the Lines hooked up
And to the Injector pump
Here is the Jumper wire I made to go from the GM Weatherpac to The Deutsch ends I put on the pump
I also Mounted My new CB and ETG
Then put the Mock up panel up with the mounts I built held it in place with a small magnet while I welded it in place
Here is the Panel bolted up and connected to the lines, I used -6 Braided lines I made at work to go to the FF
Here is the FF with the Lines hooked up
And to the Injector pump
Here is the Jumper wire I made to go from the GM Weatherpac to The Deutsch ends I put on the pump
I also Mounted My new CB and ETG