After it's poured I'll strip the forms and then dig out around the perimeter and install a 16" piece of foam board vertically and a 24" piece horizontally at the base of the concrete. then rebackfill and in the process put some flashing around it similar to what on the existing building
So an update I replaced my fan clutch because of the long delay to engage, 5-20 minutes. At first everything seemed normal. Then made a trip to Seward to pickup a truck for my son, not so good. Even leaving the override switch on the clutch wouldn't work. Tried swapping the relay but...
I put a 30" led light bar up where the plow lights are. Then another 30 bar on top of the back rack for backing up as well as a couple of pod lights the illuminate the rear wheels. Sometimes it feels like you spend more time in reverse than forward.
got the hole filled. Trying to get some water on it to help with compaction, mother nature is assisting. That's the storm total the pink is roughly 3" so far
To meet code, which I don't have to it'd 42". I'm actually doing a monoslab so when you do that you don't have to do 42", not sure I understand the logic there at least for code. The excavating I did there was to get rid of the overburden which holds alot of moisture and can frost heave. I'll...